Reference | AJ Engineering

Case description Download PDF
Solution
Segment Heavy industry
Country United Kingdom

The Challenge

In 2017, AJ Engineering secured its biggest contract to date with a multi-million-pound windfarm deal, this was to fabricate and install the structural steel and cladding. They decided that they needed to implement something to reduce their employee’s exposure of welding fumes and grinding dust. This project involved mostly indoor work that would be carried out in their workshop. The work involved welding large pieces of metal piping, so they needed to ensure they were able to have a flexible reach and in different areas of the workshop.