References

Case description Download PDF
Country Germany

The challenge

In the plant of Tirschenreuth the welding takes place in large, undefined working areas. They tried to improve the air quality through roof ventilation, but this led to a high energy loss.

The hall is divided into two working areas. Each part is 38 meters long x 20 meters width x 6 meters high. The extraction volume of each part is 4500 m³.